The Expected Completion Dates for Lentoria
The developer of Lentoria expects to give vacant possession by 2 July 2027 and legal completion by 2 July 2030, according to its published particulars. In other words, the homes are expected to be ready by mid-2027, while legal completion follows three years later.
These are the developer’s expected dates. Each home is bound by the dates in its own sale and purchase agreement, which governs, so the agreement for a chosen home is the document to read.
| Date | Milestone |
|---|---|
| 19 Sep 2022 | URA awards the Lentor Hills Road (Parcel B) site, about 10,819 sq m, to TID Residential Pte. Ltd. |
| 19 Dec 2022 | The 99-year lease of the site begins |
| 3 Jan 2024 | Building plans approved (A2047-00004-2023-BP01) |
| 17 Feb 2024 | Preview opens, as reported at the time |
| 2 Mar 2024 | Sales bookings open, as reported at the time |
| 2 Jul 2027 | Expected vacant possession |
| 2 Jul 2030 | Expected legal completion |
Sources: the developer’s particulars; URA media release, 19 September 2022; press reports of the 2024 preview and launch.
How Far Construction Has Come at Lentoria
Building work at Lentoria is well advanced, and OneMap lists the development as LENTORIA (U/C), under construction, at its three addresses on Lentor Hills Road. The main contractor is Lian Beng Construction (1988) Pte Ltd, building to the designs of DP Architects, with P & T Consultants as the civil and structural engineer and BELMACS as the mechanical and electrical engineer.
Because construction is well advanced, several stages of the progressive payment scheme may already be certified when a home is booked. The Sales Concierge sets out which stages have been certified at the time of booking and the sums that fall due together.
What Completion Means for Lentoria Payments
Homes at Lentoria are paid for in stages as construction is certified. Once the car park, roads and drains are complete, 60% of the price has been paid; the Temporary Occupation Permit then brings a 25% instalment, and the Certificate of Statutory Completion the final 15%.
For a buyer who books late in construction, the instalments for stages already certified become payable together on the timetable in the sale and purchase agreement, so more of the price is paid soon after booking and more of the loan is drawn at once. Interest runs only on the sum drawn, but the monthly repayment starts higher than it would on a project at foundation stage. The Lentoria payment scheme page lists every stage.
The Land and Lease behind Lentoria
Lentoria stands on Lot 05407W of Mukim 20 at Lentor Hills Road, in the Ang Mo Kio planning area. URA offered the site, of about 10,819 square metres, on a 99-year lease under the Government Land Sales programme, with a gross plot ratio of 2.1 and a maximum gross floor area of 22,720 square metres. The lease began on 19 December 2022, and the developer’s particulars record the encumbrances as nil.
On that land stand two 17-storey blocks and one of 8 storeys, with two basement car parks and communal facilities on Level 1, Level 2 and Level 14. The site is in District 26, in the Outside Central Region, and each block has its own address and postal code: 32 Lentor Hills Road (788851), 36 Lentor Hills Road (788853) and 38 Lentor Hills Road (788854).
What Was Approved and Is Being Built at Lentoria
The building plans for Lentoria were approved on 3 January 2024, under reference A2047-00004-2023-BP01. The developer’s particulars describe two blocks of 17 storeys and one of 8 storeys, with 267 homes in total, two basement car parks and communal facilities. Blocks 36 and 38 carry the Sky Terrace on Level 14, where neither has homes, and Block 32 rises 8 storeys on the Lentor Hills Road side.
Below ground, the fact sheet provides 227 car park lots, three of them with electric-vehicle charging, three accessible lots and 101 bicycle lots, and the site plans number 42 facilities on Level 1, Level 2 and Level 14. The Lentoria project details page gathers every published particular with its source, and the facilities and particulars remain subject to the approved plans.
Keeping Track of Lentoria Milestones
The Lentoria latest updates page keeps a dated record of each milestone, newest first. The same page names what comes next: the homes that stay available on the balance units chart while sales continue, fresh caveats listed on the recent transactions page, the construction stages still to be certified before vacant possession, and any rule change by IRAS or MAS, which the stamp duty and housing loan pages will reflect.
Lentoria is open for sale, and the Sales Concierge sends the price list with the homes that remain and a payment schedule that reflects the stages already certified. Showflat viewings are arranged by appointment through the Sales Concierge.
General information as at the date shown, not financial, legal or tax advice. Particulars of Lentoria come from the developer’s published particulars, fact sheet, brochure and plans; statutory figures are those on this site’s financing pages, and distances are straight lines measured on OneMap. Sources: the developer’s published particulars and fact sheet, the URA media release of 19 September 2022, OneMap and press reports of the 2024 preview and launch, as set out on this site’s latest updates, project details and payment scheme pages.
Ask the Sales Concierge about Lentoria
Ask the Sales Concierge for the price list, the homes that remain and the e-brochure for Lentoria. Showflat viewings are arranged by appointment through the Sales Concierge.
